Clutha River Pump Shed
Last Data Received 34 seconds ago
Dam 5 Level
2.10
Transfer Dam Level
2.6
9A Flow Meter
0.0
9B Flow Meter
0.0
Injection Bore
0.0
9A Flow Meter
0
9B Flow Meter
0
Injection Bore
0.0
Pump Start
off
Off Timer
off
6A Pivot Run
off
6A Pivot Fault
off
Pivot 9B Call to
Stop
Pivet 9C Call to
Stop
Upper Terrace Pumps Running
off
Lower Terrace Pumps Running
off
9A/9B Bores Running
off
Upper Terrace Pump Status
Normal
Lower Terrace Pumps Status
Normal
9A/9B Bore Pump Status
Normal
Pivot 9A 100mm
32.0
Pivot 9A 300mm
28.3
Pivot 9A 100mm
9.1
Pivot 9A 300mm
20.6
Pivot 9B 100mm
26.4
Pivot 9B 300mm
25.2
Pivot 9B 100mm
9.0
Pivot 9B 300mm
9.0
Pivot 9C 100mm
15.8
Pivot 9C 300mm
21.0
Pivot 9C 100mm
9.4
Pivot 9C 300mm
9.8
11437
-92
System Battery
12.1
Cellular Signal Strength
20.0
Page loaded at (latest data 34 seconds ago)

Arrows ( and ) show trend—change over last 30 minutes (minimum of ±0.5 required to show trend arrow).

Click on name of unit to view the graphs.

Go to the Basic Text Version of this page (contact us to set up a shortcut name).